Drink near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 14
Bread Paradise
CafesApproximately 1.93 KM away
Address : 2.16, Level 2, Quill City Mall, 1018, Jalan Sultan Ismail, Chow Kit, Kuala Lumpur
Salon Du Chocolat
CafesApproximately 1.93 KM away
Address : G.35 - G.36, Ground Level, Quill City Mall, 1018, Jalan Sultan Ismail, Chow Kit, Kuala Lumpur
The Lobby Lounge - The Ritz-Carlton
CafesApproximately 1.93 KM away
Address : The Ritz-Carlton, 168, Jalan Imbi, Bukit Bintang, Kuala Lumpur
Angus House
CafesApproximately 1.95 KM away
Address : F8.F11, Explore Floor, Starhill Gallery, 181, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur
Greyhound Cafe
CafesApproximately 1.95 KM away
Address : Piccolo Hotel, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur
League Of Captains
CafesApproximately 1.97 KM away
Address : 42 - 50, The Row, Jalan Doraisamy, Chow Kit, Kuala Lumpur
Field Tea - MFC Food World
CafesApproximately 1.98 KM away
Address : Second Floor, Fahrenheit 88 Shopping Centre, Jalan Sultan Ismail, Bukit Bintang, Kuala Lumpur
Butter + Beans
CafesApproximately 1.98 KM away
Address : 42A, The Row, Jalan Doraisamy, Chow Kit, Kuala Lumpur
Tous les Jours
CafesApproximately 1.98 KM away
Address : 126A.C, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur
Oriental Dessert - Hutong
CafesApproximately 1.99 KM away
Address : Lower Ground Floor, Lot 10, Jalan Sultan Ismail, Bukit Bintang, Kuala Lumpur