Food & Drink

Food near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia

 
Showing 1 - 10 of 27

Old Chang Kee - Lot C 12
Food

Approximately 0.65 KM away

Address : Lot C 12, 156 Jalan Ampang, Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia

Patzi Snekz
Food

Approximately 0.67 KM away

Address : 1 - 93, Ground Floor, Jalan Ampang, Kuala Lumpur City Centre, Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia

Cake Sense
Bakeries

Approximately 0.78 KM away

Address : Concourse Level, Suria KLCC, Kuala Lumpur City Center, Kuala Lumpur

Eis Cookies
Bakeries

Approximately 0.81 KM away

Address : Lower Ground Level, UTC Keramat, Jalan Datuk Keramat, Kampung Datuk Keramat, Kuala Lumpur

Burger 68
Food

Approximately 0.84 KM away

Address : Jalan Datuk Abdul Malik, Kampung Baru, 50300 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, Malaysia

The Mandarin Cake Shop - Mandarin Oriental
Bakeries

Approximately 1.06 KM away

Address : Mandarin Oriental, Jalan Pinang, Kuala Lumpur City Center, Kuala Lumpur

Yola Confectionaries
Bakeries

Approximately 1.24 KM away

Address : 18.BWH.A, Flat PKNS, Jalan Raja Muda, Kampung Baru, Kuala Lumpur

Daily Treats - The Westin
Bakeries

Approximately 1.29 KM away

Address : The Westin, 199, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur

Tini Cake & Cookies
Bakeries

Approximately 1.52 KM away

Address : Jalan Raja Abdullah, Kampung Baru, Kuala Lumpur

Uncle Tetsu's Cheesecake
Bakeries

Approximately 1.55 KM away

Address : 1.05.01, Level 1, Pavillion Mall, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur