Drink near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 3
R.A.W. (Real and Wholesome)
CafesApproximately 0.68 KM away
Address : Wisma Equity, 150 Jalan Ampang, KL., Malaysia
Salad Telier
CafesApproximately 0.68 KM away
Address : G.9A, Ground Floor, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur
Bre@d Lounge - GTower
CafesApproximately 0.69 KM away
Address : GTower, 199, Jalan Tun Razak, Kuala Lumpur City Center, Kuala Lumpur
Starbucks - 13 Jalan 12/32b
CafesApproximately 0.73 KM away
Address : 13 Jalan 12/32b, Tsi Business & Industrial Park, Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
The Pnb Darby Cafe
Cafes | HotelsApproximately 0.74 KM away
Address : 10 Jalan Binjai, Kuala Lumpur, Kuala Lumpur Federal Territory, Malaysia
Coffee Break
CafesApproximately 0.74 KM away
Address : FC.100, First Level, UTC Keramat, Kampung Datuk Keramat, Kuala Lumpur
Eight Ounce Coffee
CafesApproximately 0.77 KM away
Address : First Level, Suria KLCC, Kuala Lumpur City Center, Kuala Lumpur
Harrods Cafe
CafesApproximately 0.77 KM away
Address : Ground Level, Suria KLCC, Kuala Lumpur City Center, Kuala Lumpur