Cafes near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 2
Plan b.Roasters
CafesApproximately 0.48 KM away
Address : G4, Ground Floor, The Intermark Mall, 348, Jalan Tun Abdul Razak, Kampung Datuk Keramat, Kuala Lumpur
Dondang Sayang Coffee House
CafesApproximately 0.49 KM away
Address : Jalan Ampang, Kuala Lumpur, Kuala Lumpur Federal Territory, Malaysia
Dome (Intermark)
CafesApproximately 0.53 KM away
Address : The Intermark, 06, Jalan Tun Razak, 50400 Kuala Lumpur, WP, Malaysia
The Food Store - Double Tree by Hilton
CafesApproximately 0.53 KM away
Address : Level 1, Double Tree by Hilton, The Intermark, 348, Jalan Tun Razak, Kampung Datuk Keramat, Kuala Lumpur
Megan Avenue 2
CafesApproximately 0.54 KM away
Address : Jalan Yap Kwan Seng, Kuala Lumpur, Kuala Lumpur Federal Territory, Malaysia
Dessert - Taste Enclave
CafesApproximately 0.55 KM away
Address : Level 2, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur
Juan Valdez
CafesApproximately 0.65 KM away
Address : M.2, Mezzanine, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur
Tokyo Pastry
CafesApproximately 0.66 KM away
Address : SAC.M.1 & SAC.M.20, Mezzanine, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur
Secret Recipe - Jalan Ampang
CafesApproximately 0.67 KM away
Address : Jalan Ampang, Kuala Lumpur, Kuala Lumpur Federal Territory, Malaysia
Maker's Cafe
CafesApproximately 0.67 KM away
Address : B-0-2, Ground Floor, Block A, Wisma HB, 12, Jalan Yap Kwan Seng, Kampung Baru, Kuala Lumpur