Food & Drink

Cafes near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 3

 
Showing 21 - 30 of 140

R.A.W. (Real and Wholesome)
Cafes

Approximately 0.68 KM away

Address : Wisma Equity, 150 Jalan Ampang, KL., Malaysia

Salad Telier
Cafes

Approximately 0.68 KM away

Address : G.9A, Ground Floor, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur

Bre@d Lounge - GTower
Cafes

Approximately 0.69 KM away

Address : GTower, 199, Jalan Tun Razak, Kuala Lumpur City Center, Kuala Lumpur

Urbean
Cafes

Approximately 0.69 KM away

Address : C.14, Concourse, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur

Samba
Cafes

Approximately 0.72 KM away

Address : Level 3, Avenue K, 156, Jalan Ampang, Kampung Baru, Kuala Lumpur

Starbucks - 13 Jalan 12/32b
Cafes

Approximately 0.73 KM away

Address : 13 Jalan 12/32b, Tsi Business & Industrial Park, Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia

The Pnb Darby Cafe
Cafes | Hotels

Approximately 0.74 KM away

Address : 10 Jalan Binjai, Kuala Lumpur, Kuala Lumpur Federal Territory, Malaysia

Coffee Break
Cafes

Approximately 0.74 KM away

Address : FC.100, First Level, UTC Keramat, Kampung Datuk Keramat, Kuala Lumpur

Eight Ounce Coffee
Cafes

Approximately 0.77 KM away

Address : First Level, Suria KLCC, Kuala Lumpur City Center, Kuala Lumpur

Harrods Cafe
Cafes

Approximately 0.77 KM away

Address : Ground Level, Suria KLCC, Kuala Lumpur City Center, Kuala Lumpur