Japanese / Sushi Restaurants near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 3

 
Showing 21 - 30 of 70

Ten Japanese
Japanese / Sushi Restaurants

Approximately 1.14 KM away

Address : A.G.1, Ground Floor, Marc Residence, 3, Jalan Pinang, Kuala Lumpur City Center, Kuala Lumpur

Gobo Chit Chat - Traders Hotel
Japanese / Sushi Restaurants

Approximately 1.16 KM away

Address : Level 5, Traders Hotel, Persiaran KLCC, Kuala Lumpur City Center, Kuala Lumpur

Ozeki
Japanese / Sushi Restaurants

Approximately 1.21 KM away

Address : G7, Ground Floor, Menara TA One, 22, Jalan P Ramlee, Kuala Lumpur City Center, Kuala Lumpur

THIRTY8 - Grand Hyatt
Japanese / Sushi Restaurants

Approximately 1.25 KM away

Address : Grand Hyatt, 12, Jalan Pinang, Kuala Lumpur City Center, Kuala Lumpur

Oribe Sushi
Japanese / Sushi Restaurants

Approximately 1.40 KM away

Address : Ground Floor, Block C.1, ViPod Residences, 6, Jalan Kia Peng, Kuala Lumpur City Center, Kuala Lumpur

Koryori Enoshima
Japanese / Sushi Restaurants

Approximately 1.42 KM away

Address : 22 - 24, Ground Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Hime
Japanese / Sushi Restaurants

Approximately 1.42 KM away

Address : First Level, Life Centre, 20, Jalan Sultan Ismail, Kuala Lumpur City Center, Kuala Lumpur

Senya
Japanese / Sushi Restaurants

Approximately 1.43 KM away

Address : G.W.1, Ground Floor, Westing Wing, Menara Rohas Perkasa, Jalan P. Ramlee, Kuala Lumpur City Center, Kuala Lumpur

Sagano Restaurant - Renaissance Kuala Lumpur Hotel
Japanese / Sushi Restaurants

Approximately 1.48 KM away

Address : Renaissance Kuala Lumpur Hotel, Corner of Jalan Sultan Ismail and Jalan Ampang, Kampung Baru, Kuala Lumpur

Menya Mushashi - The Intermark International Food Hall
Japanese / Sushi Restaurants

Approximately 1.49 KM away

Address : Lower Concourse Floor, The Intermark Mall, 348, Jalan Tun Abdul Razak, Kampung Datuk Keramat, Kuala Lumpur