Japanese / Sushi Restaurants near RHB Centre, Group Human Resource Level 3, Tower 3, Recruitment Management, Jalan Tun Razak, 50400, Kuala Lumpur, WP Kuala Lumpur, Malaysia - Page 4

 
Showing 31 - 40 of 70

Hosaka - Food Republic
Japanese / Sushi Restaurants

Approximately 1.55 KM away

Address : Level 1, Pavillion Mall, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur

Pepper Lunch Express - Food Republic
Japanese / Sushi Restaurants

Approximately 1.55 KM away

Address : Level 1, Pavillion Mall, Jalan Bukit Bintang, Bukit Bintang, Kuala Lumpur

Jepun Ton Chan
Japanese / Sushi Restaurants

Approximately 1.56 KM away

Address : 1.18 - 1.21, Second Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Yokozuna
Japanese / Sushi Restaurants

Approximately 1.58 KM away

Address : Fraser Place, 10, Jalan Perak, Kuala Lumpur City Center, Kuala Lumpur

Hayadon
Japanese / Sushi Restaurants

Approximately 1.59 KM away

Address : 2.38, Third Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Zipangu - Shangri-La
Japanese / Sushi Restaurants

Approximately 1.59 KM away

Address : Shangri-La, 11, Jalan Sultan Ismail, Kuala Lumpur City Center, Kuala Lumpur

Birdie Cafe
Japanese / Sushi Restaurants

Approximately 1.64 KM away

Address : Ground Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Raimu Raito
Japanese / Sushi Restaurants

Approximately 1.64 KM away

Address : 2, Ground Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Yashi-ho-mi
Japanese / Sushi Restaurants

Approximately 1.65 KM away

Address : 1, Ground Floor, Wisma Cosway, Jalan Raja Chulan, Kuala Lumpur City Center, Kuala Lumpur

Kin No Mi Zu
Japanese / Sushi Restaurants

Approximately 1.67 KM away

Address : 211, Second Floor, The Intermark Mall, 348, Jalan Tun Abdul Razak, Kampung Datuk Keramat, Kuala Lumpur